تفاصيل المشروع
Work Scope:
The preliminary equipment works include (iron reinforcement works for the mezzanine floor and the construction of an iron ladder) for the Al-Baik – Al-Orouba branch and included the following:
- Reinforcement works of the mezzanine floor slab by increasing the loading iron (I – BEAM) under the main slab.
- Removal of the old ladder.
- Construction of a new iron ladder.
- Reinforced concrete works for the rules of peace.
- The work of pouring reinforced concrete for the role of the mezzanine.
Client :
Al , Baik
Duration:
20/02/2019 to 30/02/2019
Value:
65,000 SAR (only sixty five thousand riyals)